VMware Broadcom Transition
Stay, optimize, move part of the estate or leave VMware entirely. We help you make that decision with your own numbers, then plan and run the move.
Broadcom's acquisition of VMware changed how vSphere is bought, and for many organizations the renewal quote was the first sign. A VMware Broadcom transition isn't one decision. It's a series of them: which bundle you actually need, how many cores you're paying for, which workloads belong where, and whether a move off VMware pays for itself once migration effort, retraining and new backup and DR tooling are counted.
We work through those decisions with your infrastructure and finance teams, then do the engineering: right-sizing what stays, and migrating what moves, with tested rollback at each step.
What changed after Broadcom
Broadcom completed its acquisition of VMware in November 2023. The changes that matter most for planning:
- Subscriptions replaced perpetual licenses. New perpetual licenses and Support and Subscription (SnS) renewals ended. Licensing is now a per-core subscription.
- The catalog was consolidated into bundles. The main offerings are VMware Cloud Foundation (VCF) and VMware vSphere Foundation (VVF). Products that used to be bought separately are now inside, or only available through, a bundle.
- Cores are counted with a minimum per CPU. Broadcom counts at least 16 cores for every physical CPU, so hosts with low-core-count processors pay for cores they don't have.
- Partner and support routes changed, which affects who can sell you a renewal and how support is delivered.
Confirm current terms before you decide
Bundles, ordering minimums and entitlements (such as included vSAN capacity) have changed more than once since 2023. We build the analysis on your current quote, and you should confirm current terms with Broadcom or your reseller before signing anything.
The four realistic paths
1. Stay and optimize
For many estates, staying on VMware is still the cheapest and lowest-risk option once it's right-sized. That means consolidating clusters to reduce host and core counts, replacing hosts that are over-licensed by the per-CPU minimum, retiring idle VMs, and choosing between VCF and VVF based on what you actually use. If you don't use NSX, VCF Operations (formerly Aria Operations) or the VCF lifecycle tooling, VVF may cover you. If you do, or plan to, VCF may be the better value.
2. Stay, but restructure
Some organizations stay on VMware but change the shape of the estate: consolidating several vCenters into one, moving to a VCF architecture with workload domains, or moving a site into Azure VMware Solution or another cloud-hosted VMware service to close a data center. These are VMware-to-VMware moves, usually with HCX or cross-vCenter vMotion, and they keep your tooling and skills intact.
3. Partial exit
Moving the workloads that don't need VMware's features (test and development, simple Windows and Linux servers, branch sites) to a cheaper platform, while keeping the critical tier on VMware. This reduces the licensed core count without betting everything on a new platform at once. The cost is running two platforms, with two sets of backup, monitoring and runbooks.
4. Full exit
Moving the whole estate to another hypervisor or to public cloud. It removes VMware licensing entirely, but it's the largest project: every VM converted, every integration re-pointed, DR and backup rebuilt for the new platform, and the operations team retrained. It makes sense when the license savings are large and sustained, or when a hardware refresh is due anyway.
Comparing the destinations
No platform is the right answer for everyone. This is how the common options compare on the points that usually decide the project.
| Option | Good fit when | Migration path | Watch out for |
|---|---|---|---|
| VCF on-premises | You use or want the full stack (NSX, vSAN, automation) and want to keep existing skills and tooling. | In place, or HCX / cross-vCenter vMotion into a new VCF environment. | Subscription cost at your core count; VCF architecture requirements. |
| Azure VMware Solution or other cloud-hosted VMware | You want out of a data center without re-platforming VMs. | HCX, with VMs moving unchanged. | Dedicated host pricing; network egress; it's still VMware, so licensing is bundled into the service. |
| Microsoft Hyper-V / Azure Local | You're a Microsoft shop with Windows Server Datacenter licensing and Windows-heavy workloads. | Azure Migrate (VMware to Azure Local), System Center Virtual Machine Manager conversion, or V2V tools. | Different operational model; check that backup, DR and monitoring products support it. |
| Nutanix AHV | You want an integrated hyperconverged platform with one vendor for compute and storage. | Nutanix Move, which converts VMs from ESXi. | Nutanix licensing and hardware compatibility; it replaces vSAN as well as vSphere. |
| Proxmox VE | Cost is the priority and your team is comfortable with Linux-based operations. | Proxmox's ESXi import wizard, or disk conversion. | Smaller ecosystem for backup, DR and monitoring; enterprise support is a separate subscription; the import wizard can't read disks on vSAN datastores. |
Whichever destination you choose, check three things early: whether your backup and DR products support it, whether your application vendors support their software on it, and how your team will operate it on day two.
How we assess
- Inventory. Hosts, CPUs and cores, clusters, VMs, storage and the features in use, collected with PowerCLI so the numbers are exact.
- License position. What you own, what renews when, what your current quote covers, and how many cores you'd license after right-sizing.
- Dependency mapping. Which applications run where, what talks to what, and which VMs have vendor support or compliance constraints that limit where they can go.
- Cost model. A multi-year comparison of each path built on your own quotes, hardware plans and staff costs, including the one-time costs that renewal comparisons leave out: migration effort, parallel running, new tooling and training.
- Risk review. Downtime tolerance, rollback options, DR coverage during the move, and skills on the team.
You get a written recommendation with the numbers behind it. If staying is the right answer, we'll say so.
Migration paths and execution
Moves within VMware use HCX or cross-vCenter vMotion, which keep VMs unchanged and allow live or scheduled bulk migration. Moves to another hypervisor need conversion: the VM's disks and drivers change, so each wave needs testing and a rollback plan. We use the destination vendor's tools where they're mature (Nutanix Move, Azure Migrate, Proxmox's importer) and V2V conversion where they aren't.
Execution is phased:
- Pilot. A small set of representative VMs, to prove the tooling, the driver changes and the runbook.
- Waves. Groups of VMs ordered by dependency and risk, each with a cutover runbook, test plan and rollback.
- DR and backup alignment. Protection stays in place for every VM throughout, on the old platform until the new one is protected and tested.
- Decommission. Old hosts are retired only after the license end date and the last rollback window have passed.
The detail of wave planning and cutover is on our VMware migration services page.
What you get
- Inventory and license position report
- Right-sizing plan with the licensed core count before and after
- Multi-year cost comparison of each path
- Written recommendation with risks and trade-offs
- Migration plan with waves, runbooks and rollback, if you move
- As-built documentation for the destination platform
Tools and platforms
- VMware vSphere, VCF, VVF, vSAN and HCX
- Azure VMware Solution
- Microsoft Hyper-V, Azure Local and Azure Migrate
- Nutanix AHV and Nutanix Move
- Proxmox VE
- PowerCLI and PowerShell for inventory and reporting
Frequently asked questions
Should we leave VMware after the Broadcom changes?
Not necessarily. For many estates, right-sizing and choosing the right bundle brings the cost down enough that staying is cheaper than migrating. A full exit makes sense when the savings are large and sustained, or when a hardware refresh is due anyway. The answer depends on your core count, the features you use and your team, which is why we model it with your own numbers.
What's the difference between VCF and VVF?
VMware vSphere Foundation (VVF) is the smaller bundle, centered on vSphere and its management. VMware Cloud Foundation (VCF) is the full private cloud stack, including NSX networking and the VCF lifecycle and automation tooling. If you don't use those components, VVF may be enough. Confirm the current contents of each bundle with Broadcom or your reseller, because they have changed over time.
How can we reduce our VMware license cost without leaving?
- Consolidate clusters so fewer hosts carry the same workloads.
- Replace or retire hosts whose CPUs have fewer than 16 cores, since each CPU is licensed for at least 16.
- Remove idle and oversized VMs.
- Choose the bundle that matches the features you actually use.
How long does a migration off VMware take?
It depends on the number of VMs, how many need conversion testing, and how much downtime each application allows. A pilot and a first wave can be done in weeks; a whole estate usually takes months, run in waves. We give you a schedule after the assessment, not before.
Can VMs move to Hyper-V, Nutanix or Proxmox without downtime?
Moving to a different hypervisor needs a short outage for each VM at cutover, because the VM is converted and restarted on the new platform. Tools such as Nutanix Move and Azure Migrate replicate data ahead of time so that outage is short. VMware-to-VMware moves with HCX or vMotion can be live.
What happens to backup and disaster recovery if we change platform?
Backup and DR have to be rebuilt for the new platform, and that is often the part that's underestimated. We check that your backup and replication products support the destination before you commit, and we keep every VM protected on the old platform until it's protected and tested on the new one.
Is Azure VMware Solution a way to avoid Broadcom licensing?
No. Azure VMware Solution runs VMware on dedicated Azure hosts, so VMware licensing is part of the service cost. It's a way to leave a data center quickly without converting VMs, using HCX to move them unchanged, and a common step for organizations moving to Azure over time.
Every engagement follows the same five-step approach, from discovery to handoff.
Facing a VMware renewal you didn't budget for?
Send us the quote and a rough inventory. We'll tell you what your options look like, with no sales pressure, just technical clarity.